Manufacturing
Industrial machinery and equipment
Made-to-order, spare parts and service. Core selling, stock and cash fit; several capabilities are only partly catalogued.
Good fit, some gaps Planned NAICS 333 / 3364
Status
Planned The coverage below describes the planned catalog as of repository commit 455b2c8. No app is released. Everything on this page is a plan. The repository contains a catalog and design documents, not a released app.
How the industry works
Operating characteristics
- made-to-order machines
- long lead times
- spare parts
- field service
- dealer networks
- project billing
Typical roles
- sales engineer
- production planner
- service technician
- parts clerk
- project manager
Day-to-day flows
- quote
- take a deposit
- build
- deliver
- install
- sell parts and service
Tenders and payments seen
- staged payments
- letters of credit
- bank transfer
Inventory and assets
- components
- assemblies
- spare parts
- serials
Reports they ask for
- projects by margin
- parts fill rate
- service hours
- backlog
Integrations they need
- ERP
- CAD systems
- field service tools
A day in the life (illustrative scenario)
What the catalog covers
Statuses: C catalogued, P partial, G gap, N no claim. Modules involved: SALE, TKT, INV, PRC, DISC, RET, DLV, CONN, LOGI, SVC, CRM, LOYL, GIFT, EMP, CASH, PAY, BK, LITE, RPT, ANL, MULTI, SEC, DATA, FAIL, HW, ECOM, PLAT, SET, LNCH, PKGR.
| Capability | Status | Catalog modules |
|---|---|---|
| Selling and checkout | C Catalogued | SALE, TKT |
| Inventory, lots, purchasing | C Catalogued | INV |
| Pricing, discounts, tax rules | C Catalogued | PRC, DISC |
| Returns, credit, special sales | C Catalogued | RET |
| Delivery, waybills, logistics | C Catalogued | DLV, CONN, LOGI |
| Work orders, rentals, services | C Catalogued | SVC |
| Cash drawer, shifts, safe | P Partial | CASH |
| Tender types and payments | C Catalogued | PAY |
| Customers, loyalty, gift cards | C Catalogued | CRM, LOYL, GIFT |
| Staff, time clock, payroll basics | C Catalogued | EMP |
| Bookkeeping and ledger | C Catalogued | BK, LITE |
| Reports and analytics | C Catalogued | RPT, ANL |
| Multi-store, multi-register, sync | C Catalogued | MULTI |
| Security, audit, backup, failsafes | C Catalogued | SEC, DATA, FAIL |
| Hardware and peripherals | C Catalogued | HW |
| Integrations, API, settings | P Partial | ECOM, PLAT, SET, LNCH, PKGR |
| Manufacturing planning (routings, work centres) | P Partial | no dedicated module |
| Enterprise accounting (consolidation, intercompany) | P Partial | no dedicated module |
| Project billing (progress, retainage) | P Partial | no dedicated module |
Gaps
- no engineering BOM versioning, routings, shop-floor control or CAD integration
- progress billing exists as an item (RET-0039)
Closest catalog items
Items whose names or descriptions match this industry. Matching is by keyword, so read each as a pointer, not a promise.
- Recipe / BOM definition KDSKitchen display system: a screen that replaces or supplements kitchen printers. Glossary-0029
- Production batch (prep) KDS-0034
- Composite / bundle products INV-0006
- Ingredient auto-deduction on sale KDS-0033
- Double-entry journal BK-0008
- Multi-currency ledger BK-0027
- Cost centers / classes / locations BK-0030
- Cross-outlet reports MULTI-0012
- Fixed assets register BK-0083
- Progress invoicing RET-0039
- Retention on invoices RET-0040
- Project/job costing SVC-0010
- Time-and-materials billing SVC-0009
- Prompt for serial / batch on line SALE-0046
- Partial payment / deposit SALE-0060
- Special order (out of stock) TKT-0031
Sub-verticals
Machine shop
job quotes and tooling
Open →Sub-verticalAgricultural equipment dealer
parts and service
Open →Regulation themes to verify
These are themes, not advice and not compliance claims.
- machine-safety rules
- export controls
- warranty rules (themes to verify)
Edge cases that break naive systems
- engineering change after order
- late component
- warranty claim
Classification
- NAICS
- NAICS 333 / 3364 (indicative; verify codes) · sectors 31-33
- Fortune 500 industry labels
- Industrial Machinery; Transportation Equipment; Construction and Farm Machinery; Scientific,Photographic and Control Equipment
- Fit
- Good fit, some gaps
Public references consulted
- Odoo documentation: bill of materials and work centers (excerpt)
- Construction progress billing and retainage (eSUB, Sage Intacct Construction) (excerpt)
Questions
Is Simca ready for industrial machinery and equipment today?
What is missing for industrial machinery and equipment?
Does this page give tax or regulatory advice?
Is your industry here?
Tell us what your business needs. We will say honestly whether the plan covers it.