Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Roadmap

Order, not dates

The repository gives a build order and a platform order. It gives no dates, and this site invents none.

No dates

Nothing on this page is a commitment. Statuses are from the repository snapshot. The repository now has a detailed roadmap: see phases and open decisions.

StepWhatStatus
0Catalog, strategy, contracts, ADR-0001 to ADR-0009 Built in the repository (checked files or tested library code; not a product you can run yet)
1Simca Packaging engine (milestone 2 exists; only eight elements have real prebuilt artifacts), the app core and Logistics core as libraries; this is where the project is Built in the repository (checked files or tested library code; not a product you can run yet)
2Simca Launcher (the library exists; screens, fetcher and installer do not) Designed in a document, no code yet
3Simca app on Windows (core selling, cash, inventory, Peru pack) Planned: listed in the catalog, not built
4Android and iOS phones, then tablets, then Linux Planned: listed in the catalog, not built
5The CONN supply network and Simca Logistics as separate signed packages Planned: listed in the catalog, not built
6More fiscal packs beyond Peru and the light LATAM set Planned: listed in the catalog, not built
7Regulated and specialist industries flagged as gaps Not decided

The order of steps 3 to 6 beyond "Windows first" is this site's reading of the README and ADR; confirm with the owner.