Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Industries

Manufacturing

10 industries in the Manufacturing sector group.

Status labels: Built in the repository (checked files or developer tooling, not an app feature) Designed in a document, no code yet Planned: listed in the catalog, not built Not decided Not in the catalog yet (a gap) No claim made

What is missing in Simca's plan for food production and processing, for example recipes and bom exist (kds-0029, kds-0033, kds-0034) and lots?

Gap C0717

Honest gaps for food production and processing: recipes and BOM exist (KDS-0029, KDS-0033, KDS-0034) and lots exist, but no routings, capacity planning, HACCP records, quality testing or production scheduling. Fit rating: close fit. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in food production and processing, for example yield below recipe?

Planned C0718

In food production and processing watch for: yield below recipe; ingredient substitution; lot recall; co-packer shortage. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

Which payment types do food production and processing usually see, think of invoice on terms?

Planned C0719

Typical tenders in food production and processing: invoice on terms; cash on pick-up; bank transfers; mobile wallets recorded manually. Simca's stance is cash first, wallets like Yape and Plin recorded by hand, and cards only through the phone's Tap to Pay. All planned.

Open this answer on its own page

Who works in food production and processing and what do they need, including production manager?

Planned C0720

Typical roles in food production and processing: production manager; operator; quality officer; warehouse; sales; buyer. The business is characterised by recipe-driven production; batch and lot traceability; shelf-life and cold storage. The planned catalog serves these through permissions, shifts and reports.

Open this answer on its own page

What integrations do food production and processing depend on, including scales?

Planned C0721

Integrations food production and processing typically need: scales; label printers; ERP or accountant; retailers' ordering. In Simca's plan most are files or optional adapters rather than cloud APIs; marketplace and ERP connectors are gaps.

Open this answer on its own page

What is missing in Simca's plan for beverages, brewing and bottling, such as no excise-filing module?

Gap C0722

Honest gaps for beverages, brewing and bottling: no excise-filing module; no fermentation or tank tracking; no container-deposit ledger beyond generic deposits. Fit rating: close fit. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in beverages, brewing and bottling, such as batch loss?

Planned C0723

In beverages, brewing and bottling watch for: batch loss; keg not returned; excise rate change. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

Which reports matter most in beverages, brewing and bottling, including batch cost?

Planned C0724

Reports commonly wanted in beverages, brewing and bottling: batch cost; excise summary; container balance; sales by distributor. Stock and assets to track: ingredients; tanks and barrels as stock locations; kegs and crates; finished goods. The RPT module lists planned reports; nothing is built.

Open this answer on its own page

How do beverages, brewing and bottling businesses brew or blend a batch, for example fill containers?

Planned C0725

Brew or blend a batch is one of the usual flows in beverages, brewing and bottling. Others: fill containers; sell to distributors; run a taproom. The planned catalog touches this through modules SALE, TKT, TBL, MENU, KDS, BILL; fit rating: close fit. Planned only; nothing is built.

Open this answer on its own page

What rules should beverages, brewing and bottling check locally, including licensing?

Planned C0726

Themes to verify for beverages, brewing and bottling: licensing; excise tax and stamps; labelling and alcohol-content rules; age restrictions (themes to verify). These are themes, not advice, and Simca claims no compliance with any of them.

Open this answer on its own page

What is missing in Simca's plan for household and personal products, such as no trade-promotion management or rebate accruals?

Gap C0727

Honest gaps for household and personal products: no trade-promotion management or rebate accruals; no retailer portals or EDI. Fit rating: close fit. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in household and personal products, such as promotional pricing retroactive?

Planned C0728

In household and personal products watch for: promotional pricing retroactive; damaged pallets; recalls. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

Which reports matter most in household and personal products, including sales by key account?

Planned C0729

Reports commonly wanted in household and personal products: sales by key account; promotions cost; lot trace; margin. Stock and assets to track: SKUs and variants; lots; display kits; returns stock. The RPT module lists planned reports; nothing is built.

Open this answer on its own page

How do household and personal products businesses produce or pack, for example ship to retailers and wholesalers?

Planned C0730

Produce or pack is one of the usual flows in household and personal products. Others: ship to retailers and wholesalers; manage promotions; handle returns and damages. The planned catalog touches this through modules SALE, TKT, INV, PRC, DISC, RET; fit rating: close fit. Planned only; nothing is built.

Open this answer on its own page

What rules should household and personal products check locally, including product-safety and ingredient-labelling rules?

Planned C0731

Themes to verify for household and personal products: product-safety and ingredient-labelling rules; cosmetics rules; hazardous-material shipping (themes to verify). These are themes, not advice, and Simca claims no compliance with any of them.

Open this answer on its own page

What is missing in Simca's plan for apparel, textiles and footwear manufacturing, for example no cut planning or marker optimisation?

Gap C0732

Honest gaps for apparel, textiles and footwear manufacturing: no cut planning or marker optimisation; no piece-rate payroll; no subcontractor tracking beyond purchase orders. Fit rating: close fit. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in apparel, textiles and footwear manufacturing, for example fabric defect?

Planned C0733

In apparel, textiles and footwear manufacturing watch for: fabric defect; late subcontractor; size-run changes. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

Who works in apparel, textiles and footwear manufacturing and what do they need, including designer?

Planned C0734

Typical roles in apparel, textiles and footwear manufacturing: designer; cutter; seamstress or line worker; quality checker; sales; owner. The business is characterised by cut, sew and finish; size runs; subcontracted steps. The planned catalog serves these through permissions, shifts and reports.

Open this answer on its own page

What integrations do apparel, textiles and footwear manufacturing depend on, including accountant?

Planned C0735

Integrations apparel, textiles and footwear manufacturing typically need: accountant; carriers; wholesale buyers. In Simca's plan most are files or optional adapters rather than cloud APIs; marketplace and ERP connectors are gaps.

Open this answer on its own page

Which payment types do apparel, textiles and footwear manufacturing usually see, think of invoice on terms?

Planned C0736

Typical tenders in apparel, textiles and footwear manufacturing: invoice on terms; deposits on orders; cash. Simca's stance is cash first, wallets like Yape and Plin recorded by hand, and cards only through the phone's Tap to Pay. All planned.

Open this answer on its own page

What is missing in Simca's plan for chemicals, plastics and rubber, such as no process manufacturing, lab quality, safety-data-sheet or hazardous-shipping support?

Gap C0737

Honest gaps for chemicals, plastics and rubber: no process manufacturing, lab quality, safety-data-sheet or hazardous-shipping support; only a small counter or distribution warehouse could use the catalog. Fit rating: partial fit. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in chemicals, plastics and rubber, such as out-of-spec batch?

Planned C0738

In chemicals, plastics and rubber watch for: out-of-spec batch; spill; document missing at shipment. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

Which reports matter most in chemicals, plastics and rubber, including batch cost?

Planned C0739

Reports commonly wanted in chemicals, plastics and rubber: batch cost; lot trace; yield; shipments. Stock and assets to track: bulk liquids and solids; lots; shelf life; hazardous classifications. The RPT module lists planned reports; nothing is built.

Open this answer on its own page

How do chemicals, plastics and rubber businesses blend or react a batch, for example test?

Planned C0740

Blend or react a batch is one of the usual flows in chemicals, plastics and rubber. Others: test; package; ship dangerous goods with documents. The planned catalog touches this through modules SALE, TKT, INV, PRC, DISC, RET; fit rating: partial fit. Planned only; nothing is built.

Open this answer on its own page

What rules should chemicals, plastics and rubber check locally, including chemical-safety, labelling and transport rules?

Planned C0741

Themes to verify for chemicals, plastics and rubber: chemical-safety, labelling and transport rules; environmental permits; trade-control themes (themes to verify). These are themes, not advice, and Simca claims no compliance with any of them.

Open this answer on its own page

What is missing in Simca's plan for industrial machinery and equipment, including no engineering bom versioning, routings, shop-floor control or cad?

Gap C0742

Honest gaps for industrial machinery and equipment: no engineering BOM versioning, routings, shop-floor control or CAD integration; progress billing exists as an item (RET-0039). Fit rating: good fit, some gaps. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in industrial machinery and equipment, including engineering change after order?

Planned C0743

In industrial machinery and equipment watch for: engineering change after order; late component; warranty claim. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

Which payment types do industrial machinery and equipment usually see, such as staged payments?

Planned C0744

Typical tenders in industrial machinery and equipment: staged payments; letters of credit; bank transfer. Simca's stance is cash first, wallets like Yape and Plin recorded by hand, and cards only through the phone's Tap to Pay. All planned.

Open this answer on its own page

Who works in industrial machinery and equipment and what do they need, for example sales engineer?

Planned C0745

Typical roles in industrial machinery and equipment: sales engineer; production planner; service technician; parts clerk; project manager. The business is characterised by made-to-order machines; long lead times; spare parts. The planned catalog serves these through permissions, shifts and reports.

Open this answer on its own page

What integrations do industrial machinery and equipment depend on, for example erp?

Planned C0746

Integrations industrial machinery and equipment typically need: ERP; CAD systems; field service tools. In Simca's plan most are files or optional adapters rather than cloud APIs; marketplace and ERP connectors are gaps.

Open this answer on its own page

What is missing in Simca's plan for electronics, computers and network equipment, such as no mes, test records or component-lifecycle management?

Gap C0747

Honest gaps for electronics, computers and network equipment: no MES, test records or component-lifecycle management; the catalog fits only the retail or distribution counter for finished goods. Fit rating: good fit, some gaps. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in electronics, computers and network equipment, such as component shortage?

Planned C0748

In electronics, computers and network equipment watch for: component shortage; counterfeit parts; firmware recall. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

Which reports matter most in electronics, computers and network equipment, including yield?

Planned C0749

Reports commonly wanted in electronics, computers and network equipment: yield; serial trace; component usage; RMA rate. Stock and assets to track: components with reels and lots; serials; RMA stock; obsolescence. The RPT module lists planned reports; nothing is built.

Open this answer on its own page

How do electronics, computers and network equipment businesses buy components, for example build and test?

Planned C0750

Buy components is one of the usual flows in electronics, computers and network equipment. Others: build and test; assign serials; ship to channel. The planned catalog touches this through modules SALE, TKT, INV, PRC, DISC, RET; fit rating: good fit, some gaps. Planned only; nothing is built.

Open this answer on its own page

What rules should electronics, computers and network equipment check locally, including product-safety and electromagnetic rules?

Planned C0751

Themes to verify for electronics, computers and network equipment: product-safety and electromagnetic rules; export controls; e-waste (themes to verify). These are themes, not advice, and Simca claims no compliance with any of them.

Open this answer on its own page

What is missing in Simca's plan for aerospace and defense, including out of scope: program management, configuration control, certification records?

Gap C0752

Honest gaps for aerospace and defense: out of scope: program management, configuration control, certification records and defense contracting are not addressed; at most a parts counter or exchange store. Fit rating: peripheral. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in aerospace and defense, including part with missing paperwork?

Planned C0753

In aerospace and defense watch for: part with missing paperwork; configuration change; audit. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

What integrations do aerospace and defense depend on, for example erp?

Planned C0754

Integrations aerospace and defense typically need: ERP; PLM; government portals. In Simca's plan most are files or optional adapters rather than cloud APIs; marketplace and ERP connectors are gaps.

Open this answer on its own page

Which payment types do aerospace and defense usually see, such as milestone payments?

Planned C0755

Typical tenders in aerospace and defense: milestone payments; government payments; letters of credit. Simca's stance is cash first, wallets like Yape and Plin recorded by hand, and cards only through the phone's Tap to Pay. All planned.

Open this answer on its own page

Who works in aerospace and defense and what do they need, for example program manager?

Planned C0756

Typical roles in aerospace and defense: program manager; quality engineer; buyer; MRO technician; contracts manager. The business is characterised by long programs; strict configuration control; certified suppliers. The planned catalog serves these through permissions, shifts and reports.

Open this answer on its own page

What is missing in Simca's plan for metals, mining and raw materials, including mine planning and processing are out of scope?

Gap C0757

Honest gaps for metals, mining and raw materials: mine planning and processing are out of scope; scale-ticket purchasing from sellers and sale by weight fit the catalog's scale items only in part; no weighbridge integration or grade pricing is documented. Fit rating: good fit, some gaps. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in metals, mining and raw materials, including moisture deduction?

Planned C0758

In metals, mining and raw materials watch for: moisture deduction; contaminated load; price index changes. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

What integrations do metals, mining and raw materials depend on, for example weighbridge scales?

Planned C0759

Integrations metals, mining and raw materials typically need: weighbridge scales; accounting; carriers. In Simca's plan most are files or optional adapters rather than cloud APIs; marketplace and ERP connectors are gaps.

Open this answer on its own page

Which payment types do metals, mining and raw materials usually see, such as cash to sellers (scrap?

Planned C0760

Typical tenders in metals, mining and raw materials: cash to sellers (scrap); invoice to buyers; bank transfers. Simca's stance is cash first, wallets like Yape and Plin recorded by hand, and cards only through the phone's Tap to Pay. All planned.

Open this answer on its own page

Who works in metals, mining and raw materials and what do they need, for example weighbridge operator?

Planned C0761

Typical roles in metals, mining and raw materials: weighbridge operator; yard hand; buyer; sales; compliance. The business is characterised by extraction or smelting at scale; weighbridge tickets; grade-based pricing. The planned catalog serves these through permissions, shifts and reports.

Open this answer on its own page

What is missing in Simca's plan for building materials, paper, packaging and glass, including no cutting or nesting optimisation?

Gap C0762

Honest gaps for building materials, paper, packaging and glass: no cutting or nesting optimisation; no EDI; no pallet-pool tracking. Fit rating: close fit. The planned catalog is not a shipped product.

Open this answer on its own page

What edge cases trip up point-of-sale systems in building materials, paper, packaging and glass, including custom-size waste?

Planned C0763

In building materials, paper, packaging and glass watch for: custom-size waste; delivery refused; pallet not returned. A system that cannot handle these will frustrate the business; the catalog's failsafe items address some generic cases.

Open this answer on its own page

Who works in building materials, paper, packaging and glass and what do they need, for example sales rep?

Planned C0764

Typical roles in building materials, paper, packaging and glass: sales rep; production; driver; warehouse; accounts. The business is characterised by heavy, bulky goods; contract and spot pricing; delivery logistics. The planned catalog serves these through permissions, shifts and reports.

Open this answer on its own page

What integrations do building materials, paper, packaging and glass depend on, for example carriers?

Planned C0765

Integrations building materials, paper, packaging and glass typically need: carriers; ERP; customer ordering. In Simca's plan most are files or optional adapters rather than cloud APIs; marketplace and ERP connectors are gaps.

Open this answer on its own page

Which payment types do building materials, paper, packaging and glass usually see, such as invoice on terms?

Planned C0766

Typical tenders in building materials, paper, packaging and glass: invoice on terms; cash at the yard; bank transfers. Simca's stance is cash first, wallets like Yape and Plin recorded by hand, and cards only through the phone's Tap to Pay. All planned.

Open this answer on its own page