Industries / Legacy Fortune 500 gaps
Which part of “Drive-thru lanes and order-ready timers” is still missing from the Simca plan?
Planned: listed in the catalog, not built C0936
The catalog covers order-ready pager system; order timer / ticket age, but drive-thru lane staging and speed-of-service timers is missing. Planned / not in the catalog yet (suggested by legacy F500 review): multi-lane order points; order sequence and merge; speed-of-service timers; staging bay and runner are the elements that businesses like McDonald's, Starbucks, Yum Brands, Chipotle typically expect. Planned only.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.