Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Stock, books and reports / Inventory and purchasing

Where does “Recipes and bills of materials” fit in Simca, especially around yield changes?

Planned: listed in the catalog, not built C0120

A list of ingredients or components consumed when something is made or sold. Plan for: yield changes; substitute ingredient; waste not counted. In the catalog it is a plan and nothing is built.

Go to the related page

How to read this

The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.

More in Inventory and purchasing