Industries / Construction, trades and real assets
What is missing in Simca's plan for construction and engineering, think of progress invoicing and retention exist as items (ret-0039, ret-0040)?
Not in the catalog yet (a gap) C0797
Honest gaps for construction and engineering: progress invoicing and retention exist as items (RET-0039, RET-0040), job costing as SVC-0010; no estimating, scheduling, change-order management or subcontractor compliance. Fit rating: close fit. The planned catalog is not a shipped product.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.