Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Migrating and buying / Migration

Is “Parallel run” supported today, in particular regarding double work?

Planned: listed in the catalog, not built C0239

Running old and new systems side by side for a short time to compare totals. Plan for: double work; different rounding; staff confusion. In the catalog it is a plan and nothing is built.

Go to the related page

How to read this

The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.

More in Migration