Hardware, platform and safety / Offline-first architecture
Is “Crash and power-cut safety” supported today, considering printer prints but sale lost?
Planned: listed in the catalog, not built C0211
Atomic writes and journaling so a failure never loses a completed sale. Plan for: printer prints but sale lost; half-written receipt; battery drains. In the catalog it is a plan and nothing is built.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.
More in Offline-first architecture
- Where does “Time and ordering” fit in Simca, with a focus on device clock jumps?
- What should owners check about “Core and logistics isolation”, considering contract versioning?
- Where does “Packaging engine” fit in Simca, thinking about spec validation?
- See it in context with the whole topic
- Search all answers