Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Offline-first architecture

Owner pay and affiliated-company costs

ADR-0009 (tentative): the owner may pay himself and his other companies from the cost base. Every cost line carries a related-party flag that cannot be omitted; such lines are shown separately and labelled, with an optional documented basis (otherwise it says no basis documented), and they sit inside the split, never on top. The calculation and the public view exist as code with MOCK data. The flag is only as honest as the person who sets it.

Built in the repository (checked files or tested library code; not a product you can run yet)

What to plan for

  • The signing process cannot know who is affiliated
  • The second signer may be related to a line
  • A lawyer should say if more disclosure is needed

What the catalog lists

Planned items that match this topic (keyword match; read each as a pointer):

Honesty note

Everything listed is a plan or a design principle. No app is released and nothing is audited or certified.

Related