Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Offline-first architecture

Data model

The logistics subproject has a draft SQLite schema that executes; it is a file, not a product.

Built in the repository (checked files or developer tooling, not an app feature)

What to plan for

  • Schema changes
  • Contract evolution
  • Constraints

What the catalog lists

Planned items that match this topic (keyword match; read each as a pointer):

Honesty note

Everything listed is a plan or a design principle. No app is released and nothing is audited or certified.

Related