Cash and payments / Cash-first workflows
Why would a shop need “X report (mid-shift)”?
Planned: listed in the catalog, not built C0297
For X report (mid-shift) (CASH-0009) the catalog says: Interim totals without closing. It is core priority within “Register session” and sits in both Lite and Pro. It is not a feature yet.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.