Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Launcher, packaging and logistics / PKG: Simca Packaging (Engine, Package Spec) & Element Catalog

What does the “Add-element-later flow” item cover?

Planned: listed in the catalog, not built C0423

Add-element-later flow is item PKG-0022 in the “” section of Simca Packaging. In the catalog it covers: Add elements from the launcher: it writes a new package spec and obtains a new signed package from the engine (online on request, or by file). Nothing is built.

Go to the related page

How to read this

The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.

More in PKG: Simca Packaging (Engine, Package Spec) & Element Catalog