Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Launcher, packaging and logistics / LOGI: Simca Logistics (free overlay on Interchange/CONN): Load Board, Dispatch,

How important is “Maximum bid rounds” in the catalog?

Planned: listed in the catalog, not built C0484

Maximum bid rounds carries optional priority in Simca Logistics, section “Bidding, counter-bid, accept”. Description: Limit number of counter rounds. Priority is only a planning label.

Go to the related page

How to read this

The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.

More in LOGI: Simca Logistics (free overlay on Interchange/CONN): Load Board, Dispatch,